Failure to Attend Pre-Bid Site Visit Proves Fatal to Contractor’s Differing Site Conditions Claim
Changed Conditions (Differing Site Conditions),Differing,Federal,Pre-bid Meetings
Email this page to a friend:
A government repair and alteration contract required installing new shower units to existing supply piping. Upon demolishing the shower wall, the contractor discovered that due to the location of the existing supply lines it would have to remove and replace the pipes. The contractor, who had not attended the government’s pre-bid site visit, claimed a [...]
Email this page to a friend:


