Role of Architect in Controlling Construction Costs
AIA,Cost Estimates and Cost Overruns,DP Responsibility for Contractor Cost Overruns,Redesign,Redesign without Compensation
Email this page to a friend:
The 1997 edition of the American Institute of Architects Standard Form of Agreement between Owner and Architect, AIA, B141-1997 fundamentally changes the role of the Architect regarding responsibility for controlling construction costs. New section 2.1.7.1, is for the most part, a restatement of old Subparagraphs 2.2.5, 2.3.2, and 2.4.3, with one critical difference. The prior [...]