Prime Designers in California Held to Owe Duty to Future Purchasers

Dion N. Cominos, Esq.
Gordon & Rees LLP   

The Supreme Court of California has now published its decision in Beacon v. Skidmore, Owings & Merrill (211 Cal.App.4th 1301 (2014)).  In short, the Court concluded that prime architects designing residential buildings owe a duty of care to future homeowners even though they do not actually build the projects themselves or exercise ultimate control over their construction.

Procedural/Factual Background

Of importance, Beacon involved a demurrer at the trial court level meaning that, on appeal, the Supreme Court was required to accept the facts pled in Plaintiff’s amended complaint as being true.  This included the allegation that the Beacon project’s designers provided their services “knowing that the finished construction would be sold as condominiums.”  It was also claimed that the Defendants played an active role throughout the construction process, including coordinating efforts of the design and construction teams, conducting weekly site visits and inspections, recommending design revisions as needed, and monitoring compliance with design plans.  For their various services, the designers were reportedly paid $5 million.  Plaintiff alleged that negligent design work resulted in several defects, including extensive water infiltration, inadequate fire separations, excessive solar heat gain, structural cracks, and other safety hazards.

Explanation of Court’s Decision

In reaching its decision that architects owe a duty of care to future homeowners, the Court distinguished its earlier holding in Bily (limiting the duty of care owed by auditing firms to non-client third parties) by pointing out that the Beacon case involved: (1) a much closer connection between the Defendants’ conduct and Plaintiff’s injury; (2) a far more limited class of potentially-affected persons/transactions; and (3) an absence of “private ordering” options that could efficiently protect homeowners from design defects and their resulting harms.

The Supreme Court also distinguished the Court of Appeal’s earlier decision in Weseloh, noting that the Defendants in that case played a materially different role in their construction project in that they had no direct contractual relationships with either the owner or general contractor, were paid a limited fee, and did not supervise construction of the subject retaining walls.  In the Court’s words, “Weseloh merely suggests that an architect’s role in a project can be so minor and so subordinate to the role or judgment of other design professionals as to foreclose the architect’s liability in negligence to third parties.”  Also noteworthy is the fact that Weseloh was decided on summary judgment (as opposed to demurrer), thus allowing the trial court to actually test the viability of plaintiff’s claims against an established body admissible evidence rather than assuming all of the factual allegations to be true.

The Beacon Court concluded its analysis by applying the so-called Biakanjafactors in reaching its ultimate determination that a duty of care was owed, noting that: (1) Defendants’ work was intended to benefit the Plaintiff homeowners; (2) it was foreseeable that these homeowners would be among the limited class of persons harmed by negligently-designed units; (3) Plaintiffs have suffered injury in that the design defects made their homes unsafe/uninhabitable; (4) because Defendants were the sole architects on the project, there is a close connection between their conduct and the injury suffered; (5) significant moral blame attached to Defendants’ conduct given their role coupled with the awareness that future homeowners would rely on their specialized expertise in designing safe/habitable homes; and (6) the policy of preventing future harm to homeowners relying on an architect’s specialized skills supports establishing a duty of care.

Unlike the Court of Appeal, the Supreme Court in Beacon chose not to rely on California’s “Right to Repair” Act to support its analysis, observing that even if the Act did not impose an independent statutory duty of care, such a duty would nonetheless still exist under common law.

Takeaways

Although not a total loss for the design community, Beacon will certainly have the effect of expanding A&E liability to a broader spectrum of claimants and generally keep A&E defendants in lawsuits for longer periods of time.  In sum, among the issues clarified by the opinion are the following:

Conclusion

 The lingering crucial questions following Beacon are a) whether prime designers will always be held to owe a duty of care to future purchasers as a matter of law, and b) whether sub-consulting designers will always be relieved of owing such a duty on account of their lower tier contractual status.  Unfortunately, it appears that no hard and fast bright line rule can be discerned from the opinion, and each case will be decided on its particular facts pursuant to a factually-driven Biakanja analysis.  This being the case, the probability of designers’ succeeding on dispositive motions is likely to be lower in the future.

 

DION N. COMINOS, ESQ.   | Firmwide Managing Partner
GORDON & REES LLP
275 Battery Street, Suite 2000
San Francisco, CA 94111
P: 415-986-5900  |  F: 415-262-3714
dcominos@gordonrees.com

 

This article is published in ConstructionRisk.com Report, Vol. 16, No. 7 (July 2014).

Copyright 2014, ConstructionRisk, LLC

Exit mobile version