by Kent Holland | Dec 29, 2020 | Newsletter Article
A contract clause making the contractor solely responsible for any changes of whatsoever nature was not ambiguous when it came to the extra costs to change the influent pipe size and design to fit with an “or equal” equipment item submitted by the contractor in place...
by Kent Holland | Nov 5, 2020 | Newsletter Article
Brasfield & Gorrie LLC (Brasfield) was a general contractor (GC) hired by Fritz Farm Retail Company, LLC to construct The Summit at Fritz Farm, a multi-use development. Brasfield entered into a subcontract with Harrod Concrete and Stone Co. (Harrod), for Harrod...
by Kent Holland | Nov 5, 2020 | Newsletter Article
Kent Holland created this series of short videos to provide risk management and contract drafting tips for design professional contracts. Each video is one to two minutes in length. At the conclusion of each video, the next one will start automatically. Or you can...
by Kent Holland | Nov 5, 2020 | Newsletter Article
What if you had access to the insights of the top general counsel from five of the largest construction companies for 90 minutes and could get CE credit for it? The Chief Legal Officers from Hensel Phelps, Gilbane, Balfour Beatty, Burns and McDonald, and Big D...
by Kent Holland | Nov 5, 2020 | Newsletter Article
A government contractor, pursuant to a fixed-priced contract with the U.S. Department of State, was constructing a rainwater capture and storage facility in Sierra Leone when the Ebola epidemic occurred in 2014. As a result, the contractor suspended its work,...
by Kent Holland | Sep 25, 2020 | Newsletter Article
Homeowner filed suit against its design-build contractor for defects in a $1 million swimming pool. In addition to claims for negligent design and construction defects, the homeowner asserted that the designer and design-builder were guilty of fraudulent educement,...