Developer’s Assignee Can Bring Suit against Engineer for Redesign Costs but Economic Loss Rule Prevents Original Developer (Assignor) from Bringing Negligence Action against Engineer

In this case, the court considered the scope of an assignee’s right to recover damages from an engineer that breached a contract made with the assignor. The engineer argued that while it may have breached a contract or duty before the assignment occurred, the assignee...